At Your Service

Quicklinks

Utilities & Drainage Construction

Hillside Water Storage Tank

The City will replace the 500,000 gallon elevated steel storage tank at Hillside Park with a 2 million composite (concrete stem with a steel tank) in 2008. This will be of a similar design as the recently completed tank on Prestige Circle. The tank will be the same height as the existing 500,000 gallon tank at Hillside Park. Design is complete. Construction has begun and is anticipated to be completed March 2011.

 

North Texas Municipal Water District 54-inch Waterline

Project by NTMWD
Construction of a parallel water line from Exchange to Commerce.  Anticipated completion December 2010.

 

North Texas Municipal Water District 60-inch Sanitary Sewer Rehab

Project by NTMWD
Re-lining of the existing 60-inch sanitary sewer line from FM 2551 to Summerfield pond.  Anticipated completion Fall 2010.

 

Timbercreek Sanitary Sewer Rehab

Substantially Complete

 

US 75 Waterline

Currently in design.  Construction anticipated to begin Fall 2010.

 

Walden Park Water & Sanitary Sewer Replacement

Construction anticipated to begin Winter 2010.