Capital Projects

The Engineering Department has been implementing projects from the 2008-2012 Capital Improvement Program, in the area of public infrastructure (roads, utilities and drainage). The ever-increasing challenges of a thriving and growing community have necessitated improvements in all categories.
  1. ROADS
  2. Utilities/Drainage
  3. Facilities
  4. Maps/Links
Allen Drive / US 75 Interchange

Allen Drive / US 75 Interchange Improvements

Project Manager: Kevin Bates


Construction Start: Estimated Spring of 2021
FM 2551 Angel Parkway

FM 2551/Angel Parkway


(Main to Parker Road)
Project Contact: Chris Flanigan
   
Map StreetResurfacing _Jimmy_09022020_1

CBD Asphalt Rehab


Project Manager: Kevin Bates
 US 75 Ridgeview Interchange

 TxDot - US 75 at Ridgeview Drive Overpass


Project Manager: Kevin Bates
  • Construction  Late 2021 
 
 High Mast Illumination Map

 TxDOT - US 75 High Mast Illumination Project


Project Manger: Kevin Bates



  • TX DOT Project remove 8-12 existing median light and replace with High Mast illumination
 
 
dart

DART Rail Service 



The City of Allen continues to investigate moving rail transit further north in the US 75 corridor. Learn more about DART in Allen.